Science

ASME PTC 19.3 TW 2010 PDF

August 26, 2018

12 Jul JMS Southeast participated in the ASME PTC TW commit- tee performing the first major revision since to the only US thermowell. standard, known as ASME PTC TW (“TW” for thermowell), is over 40 pages due to the explanations of theory and the sheer complexity of the process. ASME PTC TW was written to replace ASME PTC following some catastrophic failures in non-steam service, these thermowells passed the.

Author: Galabar Gur
Country: United Arab Emirates
Language: English (Spanish)
Genre: Finance
Published (Last): 10 January 2007
Pages: 49
PDF File Size: 13.72 Mb
ePub File Size: 15.24 Mb
ISBN: 111-6-65215-382-1
Downloads: 96900
Price: Free* [*Free Regsitration Required]
Uploader: Goltigul

Furthermore, the process medium must not adversely affect the fatigue strength of the thermowell material. Subscribe to the newsletter.

What Has Changed with the Revision of the ASME PTC TW Standard?

As expected passing through this in-line resonance is the responsibility of the plant owner. Receive 15 new engineering projects per week — get them easily delivered into your mailbox. Main Germany Firmenprofil Kontakt.

The provisions that it contained for the wake frequency calculation were based on Asme ptc 19.3 tw 2010. Subscribe to the newsletter Your newsletters can be unscribed here at any time. How to Prevent Product Piracy. assme

TOP Related Articles  ASHRAE STANDARD 62-2001 PDF

What Has Changed with the 2016 Revision of the ASME PTC 19.3 TW Standard?

I agree to the processing and usage of my data as described in the declaration of consent. As a consequence of the Monju incident, the ASME 193.

from was completely revised and the result was published in Select a picture to open the gallery 8 Pictures. Scientific Image of the Day: Such an in-line resonance was not considered in the original calculation basis from Our portfolio can be seen asme ptc 19.3 tw 2010.

It stands as the benchmark: This 199.3 of the standard only considered the more frequently occurring vibrations at right angles to the flow direction. The amendments contained within it relate to the following three aspects. Infos can be found under www.

News from process industries from all over the world. For the case, which cannot be completely eliminated, of a thermowell rupture resulting from in-line resonance, the standard demands asme ptc 19.3 tw 2010 provisions to prevent severe injury to personnel or damage to the plant. The revision provides some clearer and more-detailed definitions.

Dos Santos International; Picture: This applies, for example, to companies in the oil, gas and chemical industries. Ptv Klingenberg a. It was caused by the rupture of a thermowell due to turbulence: This standard remained unchanged for more than 20 years.

TOP Related Articles  MCRAE CLINICAL ORTHOPAEDIC EXAMINATION PDF

How to Select the Right Measuring Spot? The vibration direction of the tube was parallel to the flow direction of the medium in the pipe.

Click on our picture gallery to find out! In there was a asme ptc 19.3 tw 2010 accident at the Japanese nuclear power plant in Monju.

Here, the permissible flexural fatigue stress must not be exceeded during the cumulative number of vibrations of 10 11 cycles. How this translates into figures is shown in the table see picture gallery.

As a result, passing through the in-line resonance is possible, if the process medium is gaseous and the range of the in-line resonance does not fall within the continuous operation of the plant. Electrical Temperature Measurement Spoilt for Choice: This article is protected by copyright.

You want to use it for your own purpose? Your newsletters can be unscribed here at any time.